Location, location, location: determining the optimal long-run expansion of the Irish electricity system considering spatial and network impacts
June 18, 2020
Attachment | Size |
---|---|
Download PDF | 1.32 MB |
In this study, researchers present the ENGINE model, an electricity system investment model developed in the ESRI, and analyse the optimal long-run power system development, minimising the costs of electricity generation under a phase-out of fossil-fuel power stations and/or the development of the North-South interconnector.